Mello, M. F. and Fassini, G. M. (2017) “APPLICATION OF THE TOOLS OF PRODUCTION ENGINEERING FOR THE REDUCTION OF DEAD TIME IN AN ASSEMBLY LINE”, Brazilian Journal of Operations & Production Management, 14(1), pp. 2–8. doi: 10.14488/BJOPM.2017.v14.n1.a1.